Modular Hyperscale Data Center Project - up to 60 MW - EU Country
Modulares Hyperscale Data Center Projekt – bis zu 60 MW – EU-Land
REF: EUR-E14-020322
An exceptional opportunity to partner in the development of a next-generation hyperscale data center, designed with a modular, phased approach scalable up to 60 MW. The site comprises approx. 100,000 sqm of privately owned land, with an initial construction phase foreseeing a facility of approx. 10,000 sqm. The related permits are partially in place and for further expansion can be easily achieved. The site benefits from a rare geolocation above an inactive coal mine with abundant cold groundwater reserves. A large-scale rainwater storage system (approx. 10 million m³) is integrated to ensure sustainable, high-efficiency cooling. Fiber connectivity is available on-site, with potential for dark fiber deployment. The infrastructure is dimensioned for up to 10,000 server racks. Future phases include the installation of an on-site 6 MW solar power plant. The project emphasizes ESG alignment, prioritizing environmental sustainability, energy efficiency, and low carbon impact. Expected PUE between 1.1 and 1.2. Current project timeline foresees: Phase I kick-off: Q4 2025; Phase I completion: Q1 2027; Phase II: by Q1 2030; Phase III: by Q1 2032.
Eine außergewöhnliche Gelegenheit zur Beteiligung an der Entwicklung eines Next-Generation Hyperscale Data Centers, das mit einem modularen, phasenweisen Ansatz konzipiert ist und auf bis zu 60 MW skalierbar ist. Das Gelände umfasst ca. 100.000 m² im Privateigentum, wobei die erste Bauphase eine Anlage von ca. 10.000 m² vorsieht. Die entsprechenden Genehmigungen sind teilweise vorhanden und können für weitere Ausbauschritte problemlos erlangt werden. Der Standort profitiert von einer seltenen geografischen Lage über einem inaktiven Kohlebergwerk mit reichlich vorhandenem Kaltwasser aus dem Grundwasser. Ein großflächiges Regenwasserspeichersystem (ca. 10 Millionen m³) ist integriert, um eine nachhaltige und hocheffiziente Kühlung zu gewährleisten. Am Standort ist Glasfaseranschluss verfügbar, mit Potenzial zur Nutzung von Dark Fiber. Die Infrastruktur ist für bis zu 10.000 Server-Racks dimensioniert. In künftigen Phasen ist die Installation einer 6 MW Photovoltaikanlage vor Ort vorgesehen. Das Projekt legt großen Wert auf ESG-Konformität, mit Priorität auf ökologischer Nachhaltigkeit, Energieeffizienz und geringer CO₂-Belastung. Erwarteter PUE-Wert zwischen 1,1 und 1,2. Aktueller Projektzeitplan: Phase I Start: Q4 2025; Phase I Abschluss: Q1 2027; Phase II: bis Q1 2030; Phase III: bis Q1 2032.
Operazione Proposta – Transaction Proposed
Initial capitalisation structure and financial details are available upon request and reserved for professional or institutional counterparties only.
Weitere Details zur Finanzierung und Beteiligungsstruktur werden ausschließlich geeigneten professionellen oder institutionellen Investoren auf Anfrage bereitgestellt.
DETTAGLI
Categoria | Infrastrutture di Pubblica Utilità |
Segmento | Data Center |
Paese | Europa |
Area | |
Regione | |
Status giuridico | Società di Capitali |
Anni di attività | Start-up |
Fatturato | Strettamente Confidenziale |
Addetti | Strettamente Confidenziale |
Profittabilità | Strettamente Confidenziale |
Indebitamento | Strettamente Confidenziale |
Immobili di proprietà | Si |
Partecipazioni di proprietà | |
Quota in vendita | Trattativa Riservata |
Prezzo richiesto | Trattativa Riservata |
Pagamento dilazionabile | No |
Accompagnamento in ingresso | No |
Altre informazioni rilevanti | Disclaimer: This communication is provided solely for general informational purposes and does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation for any investment in any jurisdiction. It is not intended for distribution to, or use by, any person or entity in any jurisdiction where such distribution or use would be contrary to local law or regulation. The information provided herein does not constitute investment advice, financial promotion, or a prospectus. Any references to project capacities, infrastructure, timelines, or sustainability features are indicative and subject to change. Access to financial data or investment-related materials is strictly reserved for professional or institutional investors as defined by applicable regulations. No assurance can be given that any investment objective will be achieved or that any return will be obtained. |